Integrity is my middle name
Inspecting your dream home is my AIM!
Mobile 210-415-4219 | Fax 210-945-0972
Perry Zelner proudly providing Real Estate Inspections for San Antonio and the surrounding areas
Exposed post tension cables.
Per current accepted trade practices, a proper sized handrail (1 1/4” X 2 5/8”) should be added to the existing hand rail.
Extensive soil erosion was noted along the east foundation wall. Repairs should be undertaken to prevent additional erosion and preserve the foundation integrity.
The construction of the rear porch roof does not meet current accepted trade practices for proper fastener attachment and column support.
The construction of the rear porch roof does not meet current accepted trade practices for proper fastener attachment.
The construction of the rear porch roof does not meet current accepted trade practices for proper fastener attachment and column support.
Integrity is my middle name
Inspecting your dream home is my AIM!
Mobile 210-415-4219 | Fax 210-945-0972
Perry Zelner, proudly providing Real Estate Inspections
for San Antonio and the surrounding areas
Improper underpinning noted.
Per current accepted trade practices, a hand rail should be added to the steps. Hand rails should be provided when an elevation change of 2 or more risers occurs.
Form board left in the foundation.
The deck at the rear of the house appears to have been built at grade level. This condition is prone to rot and insect activity.
The construction of the rear porch roof does not meet current accepted trade practices for column support.